
|
OEM Code |
364652 364752 |
| MOQ |
50pcs |
|
Payment Term |
30% TT Pay in Advance, Balance Pay Against B/L Copy, L/C |
|
Trading Term |
FOB, CIF, CFR, EXW |
|
Package |
Neutral Package or with Your Logo Package |
|
Service |
OEM & ODM |
Item NO.:
364652
Front Axle Shaft for Peugeot 206(72MM) 364652 364752
Part Number 364652
This is the left front axle shaft for Peugeot 206
Also referred to as "Stub Axle/Axle Front Left" or "Hub Pillar Stub Axle Front Left"
Compatible with various Peugeot 206 models including 2D, 2A, C, 2E, K variants
Length specification is 72MM.
Suitable for models from 1999 onwards
Part Number 364752
This is the right front axle shaft for Peugeot 206
Also called "Stub Axle/Axle Front Right" or "Hub Axle Front Right"
Compatible with Peugeot 206 models including 2D, 2A, C, 2E, K variants
Also referred to as "upright hub front right spindle"
Suitable for models from 2001 onwards
Description:
1. Low friction loss: Adopting precision machining technology to reduce rotational resistance and improve fuel economy.
2. Load bearing capacity: It can withstand the vehicle's own weight and complex loads during operation, ensuring driving stability.
3. Long service life: High strength materials and wear-resistant design are selected to reduce wear and extend maintenance cycles.
4. Strong impact resistance: It can effectively buffer the impact force caused by road bumps and enhance driving comfort.
5. Installation convenience: Standardized structural design facilitates quick installation and replacement, reducing maintenance costs.
Key Information
Both parts are steering knuckles that connect to the front suspension system of your Honda. They're critical components that house the wheel bearings and allow the wheels to turn while maintaining suspension connection.
These parts are typically replaced when:
The wheel bearing wears out
The knuckle gets damaged in an accident
Upgrading to performance components
Product category
Working Room
Packing & Delivery
Shipment & Payment
Q1:How about your delivery time?
A: Generally it will take 7-10 days if the goods are in stock.or it is 25-45 days if the goods are not in stock, it is according to quantity.