
|
OEM Code |
68022628AD 68022623AD 68022629AD 68022632AD |
| MOQ |
50pcs |
|
Payment Term |
30% TT Pay in Advance, Balance Pay Against B/L Copy, L/C |
|
Trading Term |
FOB, CIF, CFR, EXW |
|
Package |
Neutral Package or with Your Logo Package |
|
Service |
OEM & ODM |
Item NO.:
68022629ADFront Steering Knuckle Spindle for Dodge Durango Jeep Grand Cherokee 68022628AD 68022629AD
The Front Steering Knuckle Spindle (part numbers 68022628AD and 68022629AD) is a critical suspension component for the front wheels of Dodge Durango and Jeep Grand Cherokee models from 2011 to 2015. It connects the steering system to the wheel hub and suspension, allowing the vehicle to turn. These parts are typically made of cast iron or steel and are designed for durability. They are for left (driver) and right (passenger) sides.
Key Information:
These parts are OEM quality replacements that meet manufacturer specifications
They're used for the front suspension system and connect the steering rack to the wheels
Both part numbers are commonly listed together, indicating they're designed as a pair
Technical Details:
These are metal components that form part of the front suspension and steering system
They connect the steering rack to the wheel hub assembly
Installation requires lifting the vehicle, removing the wheel, disconnecting brake components, and separating ball joints
Proper torque specifications must be followed during installation
Description:
1. Low friction loss: Adopting precision machining technology to reduce rotational resistance and improve fuel economy.
2. Load bearing capacity: It can withstand the vehicle's own weight and complex loads during operation, ensuring driving stability.
3. Long service life: High strength materials and wear-resistant design are selected to reduce wear and extend maintenance cycles.
4. Strong impact resistance: It can effectively buffer the impact force caused by road bumps and enhance driving comfort.
5. Installation convenience: Standardized structural design facilitates quick installation and replacement, reducing maintenance costs.
Product category
Working Room
Packing & Delivery
Shipment & Payment
Q1:How about your delivery time?
A: Generally it will take 7-10 days if the goods are in stock.or it is 25-45 days if the goods are not in stock, it is according to quantity.