
|
OEM Code |
364697 364797 |
| MOQ |
50pcs |
|
Payment Term |
30% TT Pay in Advance, Balance Pay Against B/L Copy, L/C |
|
Trading Term |
FOB, CIF, CFR, EXW |
|
Package |
Neutral Package or with Your Logo Package |
|
Service |
OEM & ODM |
Item NO.:
364697Front Steering Spindle Knuckle for Peugeot 407 508 Citroen C5 C6 364697 364797
The front steering spindle knuckle for Peugeot Citroen models 364697 and 364797 is a critical suspension and steering component.
It connects the wheel hub to the steering system, allowing the wheel to turn
Compatible with specific Peugeot/Citroen vehicles from certain model years (exact fitment depends on year and trim)
Made of durable cast iron or forged steel for strength and longevity
Features integrated mounting points for brake calipers, wheel bearings, and tie rods
Requires proper alignment after replacement to ensure safe handling
Key features:
Material: Durable cast iron or aluminum alloy for strength and longevity
Application: Direct fit for specified vehicle models
Function: Supports wheel movement and maintains steering geometry
This component is essential for safe vehicle operation and should be replaced if worn or damaged to maintain proper steering control and alignment.
Description:
1. Low friction loss: Adopting precision machining technology to reduce rotational resistance and improve fuel economy.
2. Load bearing capacity: It can withstand the vehicle's own weight and complex loads during operation, ensuring driving stability.
3. Long service life: High strength materials and wear-resistant design are selected to reduce wear and extend maintenance cycles.
4. Strong impact resistance: It can effectively buffer the impact force caused by road bumps and enhance driving comfort.
5. Installation convenience: Standardized structural design facilitates quick installation and replacement, reducing maintenance costs.
Product category
Working Room
Packing & Delivery
Shipment & Payment
Q1:How about your delivery time?
A: Generally it will take 7-10 days if the goods are in stock.or it is 25-45 days if the goods are not in stock, it is according to quantity.